Header-Brücke_reversed
HEADER-OPER-1_reversed
Header-Industrie_reversed

engineering connections®

mageba is a globally present specialist and manufacturer of high-end structural bearings, expansion joints as well as seismic protection and structural health monitoring systems.

Bandra-Worli-Sea-Link

India

Bandra Worli Sea Link

Forming a much needed new link between the island city of Mumbai...

engineering connections®

mageba is a globally present specialist and manufacturer of high-end structural bearings, expansion joints as well as seismic protection and structural health monitoring systems.

REFSHEET-Stavros-Niarchos-mainimg

Greece

Stavros Niarchos Center

The Stavros Niarchos Foundation Cultural Center (SNFCC) in Athens is a multifunctional...

engineering connections®

mageba is a globally present specialist and manufacturer of high-end structural bearings, expansion joints as well as seismic protection and structural health monitoring systems.

Refsheet-Johan-Sverdrup-mainimg

Norway

Johan Sverdrup Field Centre

The discovery of the Johan Sverdrup field has been made in 2010...

Current topics

One of a kind

mageba India’s new Dynamic Testing Machine will help maintain the highest quality standards for the seismic isolators manufactured at its premises –...

What every bridge and structural engineer should know about selecting and specifying structural bearings

Your project requires the use of bearings to support a structure while resisting or accommodating movements or rotations – what do you...

High in the Himalayas

Construction of the Chenab Railway Bridge – the world’s highest railway bridge, in the Indian foothills of the Himalayan mountains – has...

News-Dynamic-Testing-Machine-MaIN
News-Australian-Made-bearing-bearing-production1
News-Chenab-Railway-Bridge

Impressive expansion joints for the Tappan Zee Bridge

Watch the video about the exceptional large fully factory-assembled TENSA®MODULAR expansion joints for the Tappan Zee Bridge (officially named the Governor Mario...

What every structural and civil engineer should know about "seismic isolation solutions"

Your bridge, building or other structure is to be protected against earthquakes by means of seismic isolation – but what solutions are...

Reference-Tappan-Zee-Bridge-header-adobe-stock-foto
News-Seismic-Protection-Promotion-Pendulum-Bearing

References

India

Western Express Highway (WEH) Mumbai Metro

The Mumbai Metro construction project began in 2008 and had been executed in order to meet the city’s rapid population growth.

Mumbai...

Products:

ROBO-CONTROL permanent monitoring system

Features:

Strain gauges, displacement, laser, humidity sensors, accelerators, inclinometers

Installed:

2015

City:

Mumbai

India

Bandra Worli Sea Link

Forming a much needed new link between the island city of Mumbai and its populous western suburbs, the 5.6 km long Bandra...

Products:

TENSA-MODULAR expansion joints type LR2 – LR6, RESTON-DISC bearing

Features:

max. movement 480 mm

Installed:

2009

City:

Mumbai

India

Sahar Elevated Access Road

The Sahar Elevated Access Road (SEAR), which opened to traffic in 2014, provides access for road traffic to the new Terminal T2...

Products:

RESTON-POT bearings, TENSA-GRIP expansion joints

Installed:

2014

City:

Mumbai

Structure:

Precast concrete segmental road bridge

India

Hyderabad Metro Railway

Hyderabad Metro Rail (HMR) is the world’s largest PPP (Public Private Partnership) construction project. The project, to construct a new metro rail...

Products:

RESTON-POT bearings, LASTO-BLOCK bearings, MIGUTRANS-FSL joints, MIGUTEC-KF joints

Installed:

2014-2015

City:

Hyderabad

Structure:

PSC box girder elevated metro bridge

Germany

Köhlbrand Bridge Hamburg

The Köhlbrand Bridge has been connecting Wilhelmsburg Elbe Island with the national A7 motorway since 1974. The bridge spans the 325 m...

Products:

TENSA-MODULAR LR8 expansion jonts with „QUICK-EX-System“, TENSA-MODULAR SILENT LR8- LS100 with „QUICK-EX-System“ with ROBO-DUR support ribs, TENSA-MODULAR SILENT LR10 / LR12-LS100 expansion joint with ROBO-DUR support ribs

Installation:

2014–2016

City:

Hamburg

Type:

Cable-stayed bridge

USA

Tappan Zee Bridge

The New Tappan Zee Bridge, also known as the New NY Bridge and officially named the Governor Mario M. Cuomo Bridge after...

Products:

TENSA-MODULAR LR expansion joints, RESTON-STU shock transmission units

Features:

Joints designed for movements of up to 54 inches (1.4 meters), STU capacity 800 kips

Installed:

2015–2018

City:

New York

China

Run Yang Bridges

The Run Yang – Nan Cha Bridge, opened in 2005, crosses the Yangtze River near the Chinese city of Zhenjiang. The cable...

Products:

TENSA-MODULAR expansion joints of type LR27, ROBO-CONTROL SHM Portable monitoring system

Features:

max. movement 2,160 mm

Installed:

2004

City:

Zhenjiang

Refsheet-Mumbai-Metro-mainimg
Bandra-Worli-Sea-Link
Refsheet-Sahar-Elevated-Access-Road-mainimg
REFSHEET-Hyderabad-Metro-mainimg
Refsheet-Koehlbrandbrueckemainimg
Reference-Tappan-Zee-Bridge-header-adobe-stock-foto
REFSHEET_Runyang Bridge_mainimg